Your policy pays to put it back. The county won't let you.
Here is a situation that happens constantly in Florida and surprises almost everyone it happens to.
A house built in 1978 catches fire. The insurer agrees the loss is covered and writes an estimate to rebuild what burned — same layout, same materials, same construction. Reasonable enough.
Then the county reviews the permit. The permit authority may require identified upgrades to electrical, roof, glazing or other building systems based on the applicable code and scope of repair. Requirements are not universal and must be documented with the jurisdiction.
The insurer's estimate pays to restore what was there. It does not automatically pay for any of that.
The gap between those two numbers is often the largest single item in the entire claim. And it goes unclaimed constantly, because nobody thought to look for it.
It's usually not a separate policy. It's a coverage sitting inside the one you already have, and it typically does three distinct jobs:
Undamaged portion
Pays for the undamaged portion of a structure that has to be torn out because code requires it.
Demolition
Pays for demolition — the cost of removing what the code says can't stay.
Increased cost of construction
Pays the difference between rebuilding it the old way and building it to today's standard.
Those are three separate buckets with three separate limits, and they are frequently either sublimited to a percentage of the dwelling coverage or left off the policy entirely. Which of those is true for you is a question with a real dollar answer, and it's on your declarations page.
Florida building codes have changed over time. The applicable edition, local enforcement and the property-specific repair scope determine whether an upgrade is required.
If your home or building predates the current code — and a great many Florida properties do — that distance is money. Either it's in your claim, or you're paying it yourself.
Not usually because anyone hid it. Because it requires somebody to do three things at once: know the coverage exists, read the specific code requirements that will apply to this structure in this jurisdiction, and price the delta.
A complete code-upgrade submission should include written requirements from the permitting authority, itemized costs and the relevant policy provisions.
It's ours.
You don't need to know whether you have this coverage. That's the first thing we'll tell you.