    Builders Risk Claims

    A building under construction isn't a building yet. That's the whole problem.

    Call (954) 397-9222

    It has no certificate of occupancy. It may have no walls. Its value changes every week, materials arrive and sit in the open, subcontractors come and go, and half of what you've paid for is stacked on the ground under a tarp.

    Standard property insurance isn't built for any of that, which is why builders risk exists. And because builders risk is a specialty form written for a temporary condition, it fails in ways owners and general contractors rarely see coming — usually at the worst possible moment, when a fire or a storm has already put the schedule underwater.

    Where these claims break

    The valuation basis

    Builders risk is often written on a completed-value basis — the policy limit reflects what the finished project will be worth, not what exists today. Others are written on a reporting form, where coverage tracks the value in place and depends on you filing accurate reports. Get behind on those reports and a carrier has a coinsurance argument waiting. Which form you're on determines the shape of the entire claim, and a surprising number of insureds don't know.

    Materials away from the job site

    Steel at the fabricator. Millwork in a warehouse. A generator on a truck. Some builders risk forms cover these exposures, subject to declarations, endorsements, location, transit and reporting requirements. This is where large losses quietly go partially uncovered.

    When coverage ends

    Builders risk terminates on a trigger — completion, occupancy, acceptance, sometimes a date certain, whichever comes first. Projects that are substantially finished but not formally closed out sit in a gap between builders risk and the permanent property policy, and a loss in that window can find both carriers pointing at each other.

    Faulty workmanship

    Faulty-workmanship exclusions and any exceptions for ensuing damage differ by policy. Separate evidence about defective work from damage caused by a covered peril and obtain policy-specific advice as needed.

    Soft costs: when the form actually provides coverage

    A covered loss on a project doesn't just destroy work in place. It destroys the schedule. And a destroyed schedule costs money that has nothing to do with lumber.

    When the insured purchased applicable soft-cost coverage, the documented delay may involve categories such as:

    • Additional loan interest carried during the delay
    • Extended financing and refinancing costs
    • Re-inspection and re-permitting fees
    • Additional architectural and engineering fees
    • Extended general conditions — the supervision, trailers, fencing, and security you're paying for while nothing is being built
    • Lost rents or lost income where the project's opening is pushed

    Delay in completion or delay in start-up coverage, where it's carried, reaches further still.

    These are documentable. They're also invisible unless someone goes looking, because they don't show up in a damage estimate — they show up in a financing statement.

    Why speed matters more on a construction loss than almost anywhere else

    Two clocks run at once.

    The first is the evidence. On an active site, the scene changes immediately. Debris is cleared, work resumes, the failed component gets replaced and thrown away. What doesn't get documented in the first days often can't be documented at all.

    The second is the money. Every day of delay compounds the soft costs — and those costs have to be tracked as they accrue, not reconstructed from memory six months later when the claim is finally taken seriously.

    What we do

    • Read the builders risk policy, the permanent property policy, and the contract documents together to establish who insures what, and when
    • Determine your valuation basis and whether reporting requirements were met
    • Document physical damage to work in place, materials on site, off site, and in transit
    • Identify and quantify soft costs — financing, permits, design, extended general conditions, delay
    • Address faulty workmanship exclusions where the carrier raises them, and test their scope against the actual policy language
    • Present and negotiate the claim on your behalf
    • Keep you informed at every stage

    Frequently Asked Questions

    What is builders risk insurance?
    It's a specialty property policy written for the temporary condition of a project under construction. It typically covers work in place, materials on site, and — subject to sublimits and conditions — materials off site and in transit. It ends on a trigger such as completion, occupancy, acceptance, or a date certain.
    What are soft costs and are they really covered?
    Soft costs are the non-construction expenses caused by a covered delay: additional loan interest, extended financing, re-permitting and re-inspection fees, additional design fees, extended general conditions, and in some forms lost rents or lost income. Soft-cost coverage varies considerably by form and endorsement. Review scheduled categories, waiting periods, limits and covered delay before treating a claimed amount as payable.
    The carrier is citing the faulty workmanship exclusion. Is that the end?
    Not necessarily. Faulty-workmanship language and any resulting-damage exception depend on the particular form. Review the claimed cause, scope and exclusion before drawing conclusions; coverage or legal disputes may warrant counsel.
    The project is substantially complete but not closed out. Who covers a loss now?
    That's the gap between builders risk and the permanent property policy, and both carriers may point at each other. Which one responds turns on the builders risk termination trigger, the permanent policy's inception, and the facts of occupancy or acceptance. Send us both policies and we'll read them together.

    Free Claim Review

    Send us the builders risk policy and tell us what happened. We'll read it against the permanent policy and the contract documents.